Professionalism and customer satisfaction are the core of our business. From design to fabrication, erection, and post-sales assistance, we are always by your side.
1.Conceptual Design
Turn your ideas into reality
We begin with your ideas, SNK Steel Structure will then propose a fast and binding plan in terms of design, fabrication, erection, costs, and timeframe. We provide quality work and excellent service with respect to your needs and future use.
2.Proposal Drawings
Optimum Solutions:
Energy efficiency and resistance to corrosion and severe weather conditions.
Optimum Construction Costs:
For a clear view of the details of your buildings.
A Committed Schedule:
For the best utilization of your budget and project management.
3.Contract Awarded
Signing of contract to
execute the construction
4.Detail Drawings
Outstanding Design Ability
High Engineering Capabilities
Talented
In-house Engineers
5.Fabrication
Ensure product perfection before shipment
The fabrication process consists of 7 main steps:
Cutting (Plasma, CNC, Shearing)
Full automatic welding lines
Fitting and Finishing
Shot blasting
Painting
Galvanized purlins/ girts, wall and roof sheeting
Loading process.
SNK Steel Structure commits all products are tested in-house before delivery to ensure the highest quality, comlying with the international quality standards for raw materials (ASTM Standard) and testing methods:
Dimensional and Visual checking)
Magnetic testing (MPI Testing)
Ultrasonic testing (UT Testing)
Steel protection: Shot blasting (S.A 2.0) for all jobs
Epoxy painting from first-rate international brands.
Dry film thickness testing
6.Erection
Every single component fits together perfectly
All parts of the building are packed, marked, and delivered to the job site for complete erection in a short time.)
Thanks to the materials prepared at the factories, full assembly at the job site can be quickly completed with bolts, nuts and fasteners. This ensures a fast and efficient process to deliver the final buildings.
On-site supervision and quality control are always available until the end to ensure that everything is perfect. Your building is ready.